Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
Physical Address
304 North Cardinal St.
Dorchester Center, MA 02124
SERVERACCESS.NET
SERVERACCESS.NET

What your paver patio needs beneath clay soil goes far deeper than most homeowners realize—and skipping these steps guarantees costly failure.

Paver patio base preparation in clay soil requires 6 to 12 inches of compacted aggregate and excavation depths of 10 to 16 inches, with site-specific guidance for Colorado Springs.